Request a Quote

Construction

Structural steel and site delivery · Canada and the United States

  • Flatbed and step-deck
  • Sequenced deliveries
  • Site coordination

Delivered to the build schedule

Steel, precast, and machinery landing in the order the site needs them

Rite Way Freight LTD

Operated by Rite Way Freight LTD

Montréal, Québec · In business since 1987

In build order

Deliveries are phased to the erection schedule, so steel arrives in the sequence the crane will lift it.

Live sites

Access, laydown space, and crane windows are agreed with the site before a truck is sent.

Long and heavy

Extendable and multi-axle trailers carry beams and sections that overhang a standard deck.

About construction freight

Structural steel, precast concrete, and heavy machinery for major builds — moved on flatbeds, step-decks, and multi-axle trailers matched to the load.

Sequence is what separates construction freight from general haulage. Steel is erected in a fixed order, and a beam that arrives out of turn occupies laydown space and blocks the piece that was actually needed. We coordinate with site managers, crane operators, and project leads so deliveries land in sequence with the build schedule.

Sites are rarely easy. Urban builds have narrow approaches, restricted delivery windows, and permits that dictate which hours a load may travel. Infrastructure work is often remote with limited turning room. Both are planned before dispatch rather than discovered by the driver.

What construction loads ride on

The trailer classes steel, precast, and site machinery move on.

Flatbed

Flatbed

The standard open deck.

Steel, machinery, and building materials on an open deck, loaded by crane or forklift from any side. Suited to freight up to around 48,000 lbs that fits within legal height.

Step-Deck

Step-Deck

A lower deck for taller freight.

The main deck sits lower than a flatbed, adding clearance for equipment and crated cargo that would run over-height on a standard deck — so taller loads move legally without permits.

Double-Drop & Lowboy

Double-Drop & Lowboy

A low center well for over-height machinery.

The deck drops between the axles to carry tall machinery low to the road, keeping over-height freight under the bridges and wires along the route.

RGN

RGN

Removable gooseneck — equipment drives on.

The gooseneck detaches so excavators, cranes, and other tracked or wheeled equipment drive onto the deck under their own power. Configurable to around 150,000 lbs with added axles.

Multi-Axle

Multi-Axle

Axle lines added for the heaviest loads.

For freight beyond standard legal weight, added axle lines spread the load so it can be permitted and moved. The configuration is engineered to the piece and the route.

Extendable

Extendable

Decks that stretch for long freight.

Extendable flatbeds and step-decks stretch to carry beams, pipe, and other long freight that overhangs a standard deck, with permits and escorts arranged to match the length.

Tank & Specialized

Tank & Specialized

Purpose-built trailers for energy cargo.

Cryogenic tankers and purpose-built platforms carry LNG and other energy-sector cargo under the handling and safety protocols the freight requires.

What we move for construction

  • Structural steel beams and columns
  • Trusses and fabricated sections
  • Precast panels, girders, and sections
  • Crawler and mobile cranes
  • Piling rigs and foundation equipment
  • Excavators and site machinery

Where we deliver

Construction work by region, and what each one usually involves.

Québec and Ontario

The densest build market we serve, with same-day dispatch from Montréal.

Western Canada

Industrial and resource-sector construction, often on contracted operators.

Atlantic Canada

Infrastructure and port work out of Halifax and Saint John.

United States

Cross-border steel and precast into the Northeast and Midwest.

5.0

Delivered to the build schedule

Construction freight has run on this fleet since 1987, across airports, bridges, and industrial builds.

Our certifications and compliance

Overall rating

5
4
3
2
1

Communication

5.0

On-time delivery

4.9

Load handling

5.0

Documentation

4.9

Compliance

5.0

Value

4.8

All reviews to date are five stars, consistent with the 5.0 overall rating.

Verified ClientGOOGLE REVIEW
There are not enough words in the dictionary to describe how incredible this company is. I have been using them for well over a year, almost every day.
Munther ShehadehCARRIER PARTNER
As a carrier, I’ve been doing business with Rite Way for over 7 years. Definitely one of the best brokers.
Hajrah AslamSR TRANSPORT
Rite Way Freight is very professional and organized. We’ve been working with them for 5 years.
Verified ClientGOOGLE REVIEW
Great services, unbeatable prices, hassle-free experience. They get it right every time.

Where construction freight moves

Fabrication shops, precast plants, and job sites sit at either end of these corridors — most construction lanes are shorter and run more often than project cargo.

  • Regions served
  • Primary corridors
  • Hub cities
  • Other served cities

Pickup and delivery points are confirmed per load.

Who runs a construction file

Meet our leadership team.

Zachary Khazzam

Zachary Khazzam

President

1987
In business since
EN / FR
Languages
24/7
Dispatch

Zachary leads Rite Way Freight from its Montreal headquarters, overseeing a company built over nearly four decades on a simple idea: move the loads other carriers turn down, and stay with every one of them until it is delivered.

Office hours
Mon–Fri · 7:30 – 19:30
Dispatch
24/7 for loads in transit
Discuss a construction load

Operations and administration

  • Stacey PereiraCustomer Service Manager
  • James CorbeilBusiness Development Manager
  • Ryan SmithRyan SmithOperations Manager
  • Sean KennedyLogistics Coordinator
  • Coire RussellDispatch Coordinator
  • Hanan HamdiAccounting & Administration

Things to know

Quote at no chargePriced per load · Dispatch 24/7